Rail Engineer..Top Stories..

Business as usual on the Settle and Carlisle line
Stuart Marsh examines the work undertaken to re-open the 73 mile-long line.

Hacking the railway
Britain’s railways weren’t affected by the recent worldwide cyber attack, but Germany wasn’t so lucky.

Alstom – the CLever Innovator
Steve Cox examines Alstom’s new catenary design for electrification projects.

LED lighting for level crossings
Paul Darlington looks at how LED lighting is being used to reduce accidents on level crossings.

Obstacle detection for level crossings
Radar, LiDAR and fresh ideas from Italy as IDS Ingegneria dei Sistemi tackles OD.

Read the whole magazine online
See the full digital edition here – now downloadable.